Friction Welding Geogrids

PP/PET Plastic Geogrid Strip Extruder

Produce strips for PP or PET geogrids. Material preparation, the strip profile and downstream handling are planned for the polymer and finished grid you specify.

Discuss this equipment ↗
Application
PP / PET geogrid strips
Process
Strip extrusion

Production process

Prepare plastic strips for grid production.

  • Identify PP or PET and the required material preparation.
  • Discuss extrusion, cooling and strip traction for the target profile.
  • Coordinate winding and strip dimensions with the grid-welding stage.

Your equipment proposal

Plan the configuration.

Use these product requirements to start a technical discussion with our team.

Material and strip profile

Share the reinforcement or polymer specification and the finished strip dimensions.

Output and acceptance criteria

State intended output and the dimensional, joint or finished-product test requirements.

Factory and utilities

Include available floor space, local power supply and other utility conditions.

Equipment scope

Identify existing upstream and downstream equipment, and which machines, tooling or handling systems are needed.

Capacity, dimensions, utilities and delivery scope are confirmed for the proposed configuration.

Send your requirements ↗

Start with your product

Bring your requirements.Let’s shape the equipment.

Discuss your project ↗
01 / Material

Material grade or a sample

02 / Product

A drawing and target dimensions

03 / Production

Output and quality requirements

04 / Factory

Available space and local utilities

Ruimin machinery

Useful answers

Questions about this equipment.

What does the PP/PET geogrid strip extruder produce?

Produce strips for PP or PET geogrids. Material preparation, the strip profile and downstream handling are planned for the polymer and finished grid you specify.

Which PP/PET strip specifications should I send?

Provide the material specification, strip width and thickness, target output and any dimensional requirements. Explain your planned cooling, handling and winding arrangement.

Does this extrusion stage form the grid apertures?

This product prepares strips for a welded-grid route. Grid assembly and joining take place in downstream equipment. Send the finished-grid drawing together with the strip specification.